Period 9 - 30 January 2026
Terms & conditions:
|
Hold Deposit (IDR) |
Tenor (months) Prize |
||
|---|---|---|---|
|
Cash Rewards (IDR) |
Running Slot |
||
|
100.000.000,- |
3 |
800.000,- |
1 (one) |
|
300.000.000,- |
3 |
2.400.000,- |
|
|
100.000.000,- |
6 |
1.400.000,- |
|
|
300.000.000,- |
6 |
4.200.000,- |
Maybank U/U iB Savings Information CLICK HERE
|
Hold Deposit (IDR) |
Tenor (months) |
Prize |
|
|---|---|---|---|
|
Cash Rewards (IDR) |
Running Slot |
||
|
500.000.000,- |
3 |
4.100.000,- |
2 (two) |
|
1.000.000.000,- |
3 |
7.850.000,- |
|
|
500.000.000,- |
6 |
7.200.000,- |
|
|
1.000.000.000,- |
6 |
13.700.000,- |
|
|
Running Category |
Number of Running Slot |
|---|---|
|
10K |
90 |
|
Half Marathon |
150 |
|
Marathon |
60 |
|
Prize |
Savings Period |
Initial Deposit (IDR) |
Monthly Deposit (IDR) |
Penalty Fee (IDR) |
Running Slot Quota |
|---|---|---|---|---|---|
|
1 running slot & cash reward Rp800 ribu |
12 |
50.000.000,- |
300.000,- |
2.300.000,- |
2.000 |
|
1 running slot |
12 |
25.000.000,- |
300.000,- |
1.300.000,- |